9 Day Warning: On March 2nd, NISA disciplined TEPCO on lax equipment checks before meltdown : Japan Subculture Research Center

Submitted by MEFH on
Item Description
On March 2nd, approximately nine days before the TEPCO (Tokyo Electric Power Company) Fukushima Daiichi Nuclear Power Plant Reactor One melted down, the Nuclear and Industrial Safety Agency (NISA) formally disciplined TEPCO for failure to conduct inspections on critical pieces of equipment at the Fukushima Number One and Number Two Reactor.
Translation Approval
Off
Internet Archive Flag
Flagged for Internet Archive
Media Type
Layer Type
Archive
Seeds
Location
0,0
Media Creator Username
MEFH
Media Creator Realname
MEFH
Frequency
Archive Once
Scope
One Page
Internet Archive Status
Verified
Language
English
Media Date Create
Retweet
Off
English Title
9 Day Warning: On March 2nd, NISA disciplined TEPCO on lax equipment checks before meltdown : Japan Subculture Research Center
English Description
On March 2nd, approximately nine days before the TEPCO (Tokyo Electric Power Company) Fukushima Daiichi Nuclear Power Plant Reactor One melted down, the Nuclear and Industrial Safety Agency (NISA) formally disciplined TEPCO for failure to conduct inspections on critical pieces of equipment at the Fukushima Number One and Number Two Reactor.
Flagged for Internet Archive
On
URI
http://wayback.archive-it.org/7472/20160601000000/http://www.japansubculture.com/9-day-warning-on-march-2nd-nisa-disciplined-tepco-on-lax-equipment-checks-before-meltdown/
Attribution URI
http://www.japansubculture.com/9-day-warning-on-march-2nd-nisa-disciplined-tepco-on-lax-equipment-checks-before-meltdown/