Fukushima Daiichi Nuclear Power Station Unit 3 PCV gas control system duct inspection (Video recorded by Quince 2) (44; 38) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Fukushima Daiichi Nuclear Power Station Unit 3 PCV gas control system duct inspection (Video recorded by Quince 2) (44; 38)
Discharging low radioactivity density accumulated water into the sea from Units 5-6 discharge channel (17; 20) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Discharging low radioactivity density accumulated water into the sea from Units 5-6 discharge channel (17; 20)
Discharging low radioactivity density accumulated water into the sea from south discharge channel (25; 12) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Discharging low radioactivity density accumulated water into the sea from south discharge channel (25; 12)
Injecting Water into the Spent Fuel Pool from the Japan Self-Defense Forces helicopter (1; 08; 42) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Injecting Water into the Spent Fuel Pool from the Japan Self-Defense Forces helicopter (1; 08; 42)
Spent fuel pool lining(1; 00) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Spent fuel pool lining(1; 00)
Under the steel beam and Inside of the spent fuel pool(1; 00) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Under the steel beam and Inside of the spent fuel pool(1; 00)
Lower part of the steel beam(1; 20) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Lower part of the steel beam(1; 20)
Middle part of the steel beam(8; 35) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Middle part of the steel beam(8; 35)
Series of explanatory Videos Vol.3; radiation monitoring at the site No.2 Evaluation method of the present amount of radioactive material released from the Reactor Building Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Series of explanatory Videos Vol.3; radiation monitoring at the site No.2 Evaluation method of the present amount of radioactive material released from the Reactor Building
The videos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station - 1st Floor, Nuclear Reactor Building Unit 2(Video on April 18, 2011) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about The videos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station - 1st Floor, Nuclear Reactor Building Unit 2(Video on April 18, 2011)