高所用ドライアイスブラスト除染装置の性能確認の状況について(2) (2015年12月23日:撮影) Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about 高所用ドライアイスブラスト除染装置の性能確認の状況について(2) (2015年12月23日:撮影)
高所用ドライアイスブラスト除染装置の性能確認の状況について(1) (2015年12月23日:撮影) Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about 高所用ドライアイスブラスト除染装置の性能確認の状況について(1) (2015年12月23日:撮影)
Installing an intake hose (in front of the Shallow Draft Quay) [pictured on January 26, 2012] Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about Installing an intake hose (in front of the Shallow Draft Quay) [pictured on January 26, 2012]
The Valve Flange of the Mini Flow Piping of the Waste RO Supply Pump. [pictured on January 28, 2012] Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about The Valve Flange of the Mini Flow Piping of the Waste RO Supply Pump. [pictured on January 28, 2012]
Zoom View of the Valve Flange around the Demineralizer of the Evaporation Concentration Apparatus [pictured on January 28, 2012] Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about Zoom View of the Valve Flange around the Demineralizer of the Evaporation Concentration Apparatus [pictured on January 28, 2012]
Panoramic View of the Valve Flange around the Demineralizer of the Evaporation Concentration Apparatus [pictured on January 28, 2012] Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about Panoramic View of the Valve Flange around the Demineralizer of the Evaporation Concentration Apparatus [pictured on January 28, 2012]
Flow meter of reactor water injection pump from Unit 3 condensate storage tank to Unit 3 [pictured on January 29, 2012] Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about Flow meter of reactor water injection pump from Unit 3 condensate storage tank to Unit 3 [pictured on January 29, 2012]
Flow meter of reactor water injection pump from Unit 3 condensate storage tank to Unit 2 [pictured on January 29, 2012] Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about Flow meter of reactor water injection pump from Unit 3 condensate storage tank to Unit 2 [pictured on January 29, 2012]
福島第一原子力発電所4号機 原子炉建屋横(セメントサイロ) Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about 福島第一原子力発電所4号機 原子炉建屋横(セメントサイロ)
福島第一原子力発電所4号機 原子炉建屋 (4) Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about 福島第一原子力発電所4号機 原子炉建屋 (4)