Fukushima Daiichi Nuclear Power Station Unit 3 PCV gas control system duct inspection (Video recorded by Packbot) (12; 50) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Fukushima Daiichi Nuclear Power Station Unit 3 PCV gas control system duct inspection (Video recorded by Packbot) (12; 50)
Fukushima Daiichi Nuclear Power Station Unit 3 PCV gas control system duct inspection (Video recorded by Quince 2) (44; 38) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Fukushima Daiichi Nuclear Power Station Unit 3 PCV gas control system duct inspection (Video recorded by Quince 2) (44; 38)
Discharging low radioactivity density accumulated water into the sea from Units 5-6 discharge channel (17; 20) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Discharging low radioactivity density accumulated water into the sea from Units 5-6 discharge channel (17; 20)
Discharging low radioactivity density accumulated water into the sea from south discharge channel (25; 12) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Discharging low radioactivity density accumulated water into the sea from south discharge channel (25; 12)
Injecting Water into the Spent Fuel Pool from the Japan Self-Defense Forces helicopter (1; 08; 42) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Injecting Water into the Spent Fuel Pool from the Japan Self-Defense Forces helicopter (1; 08; 42)
Spent fuel pool lining(1; 00) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Spent fuel pool lining(1; 00)
Under the steel beam and Inside of the spent fuel pool(1; 00) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Under the steel beam and Inside of the spent fuel pool(1; 00)
Lower part of the steel beam(1; 20) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Lower part of the steel beam(1; 20)
Middle part of the steel beam(8; 35) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Middle part of the steel beam(8; 35)
Series of explanatory Videos Vol.3; radiation monitoring at the site No.2 Evaluation method of the present amount of radioactive material released from the Reactor Building Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Series of explanatory Videos Vol.3; radiation monitoring at the site No.2 Evaluation method of the present amount of radioactive material released from the Reactor Building