Development status of equipment for internal PCV investigation (TOSHIBA)(photo)(2) Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about Development status of equipment for internal PCV investigation (TOSHIBA)(photo)(2)
Development status of equipment for internal PCV investigation (TOSHIBA)(photo)(1) Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about Development status of equipment for internal PCV investigation (TOSHIBA)(photo)(1)
Development status of equipment for internal PCV investigation (TOSHIBA) Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about Development status of equipment for internal PCV investigation (TOSHIBA)
Preliminary Test for "Water Stoppage Method" by Grouting into the Vent Pipe (movie 2) Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about Preliminary Test for "Water Stoppage Method" by Grouting into the Vent Pipe (movie 2)
Preliminary Test for "Water Stoppage Method" by Grouting into the Vent Pipe (movie 1) Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about Preliminary Test for "Water Stoppage Method" by Grouting into the Vent Pipe (movie 1)
Toshiba staff checking the grouting Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about Toshiba staff checking the grouting
Bottom head of testing device (vent header partially simulated from the both side of vent pipe) Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about Bottom head of testing device (vent header partially simulated from the both side of vent pipe)
Checking status of water stop material piled up Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about Checking status of water stop material piled up
Cement-based water stop material used for the test (plastic grout) Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about Cement-based water stop material used for the test (plastic grout)
Simulated portion of vent header for testing device (after placing water stop material) Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about Simulated portion of vent header for testing device (after placing water stop material)