Permanent installation of Unit 4 residual heat removal cooling system, residual heat removal cooling sea water system and emergency diesel generator cooling system Switching to the permanent cable for the electric motor of residual heat removal cooling sy Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Permanent installation of Unit 4 residual heat removal cooling system, residual heat removal cooling sea water system and emergency diesel generator cooling system Switching to the permanent cable for the electric motor of residual heat removal cooling sy
Permanent installation of Unit 4 residual heat removal cooling system, residual heat removal cooling sea water system and emergency diesel generator cooling system Switching to the permanent cable for the electric motor of residual heat removal cooling se Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Permanent installation of Unit 4 residual heat removal cooling system, residual heat removal cooling sea water system and emergency diesel generator cooling system Switching to the permanent cable for the electric motor of residual heat removal cooling se
Inspection of the inside of Unit 4 main exhaust duct 4. Displacement measurement done on the main exhaust duct from April 19 to 26, 2012 Photo taken on April 24, 2012 Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Inspection of the inside of Unit 4 main exhaust duct 4. Displacement measurement done on the main exhaust duct from April 19 to 26, 2012 Photo taken on April 24, 2012
Fukushima Daini Nuclear Power Station Unit 1 power panel (P/C 1C-1) installation 4. Power panel (P/C 1C-1) installation completed on April 19 Photo taken on April 23, 2012 Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Fukushima Daini Nuclear Power Station Unit 1 power panel (P/C 1C-1) installation 4. Power panel (P/C 1C-1) installation completed on April 19 Photo taken on April 23, 2012
D/G in standby state after recovery Unit 1 D/G (B) Photo taken on April 20, 2012 Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about D/G in standby state after recovery Unit 1 D/G (B) Photo taken on April 20, 2012
D/G in standby state after recovery Unit 2 D/G (A) Photo taken on April 20, 2012 Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about D/G in standby state after recovery Unit 2 D/G (A) Photo taken on April 20, 2012
D/G in standby state after recovery Unit 3 D/G (A) Photo taken on April 17, 2012 Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about D/G in standby state after recovery Unit 3 D/G (A) Photo taken on April 17, 2012
Leakage from Waterpipes of Outline of Temporary RHRS Pump at Unit 5 Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Leakage from Waterpipes of Outline of Temporary RHRS Pump at Unit 5
Fukushima Daiichi Nuclear Power Plant Setting steel sheet at the 1st floor of the unit 3 reactor building [pictured on July 3, 2011] Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Fukushima Daiichi Nuclear Power Plant Setting steel sheet at the 1st floor of the unit 3 reactor building [pictured on July 3, 2011]