Current Condition of Fukushima Daiichi Nuclear Power Station Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Current Condition of Fukushima Daiichi Nuclear Power Station
Permanent installation of Unit 4 residual heat removal cooling system, residual heat removal cooling sea water system and emergency diesel generator cooling system Switching to the permanent cable for the electric motor of residual heat removal cooling se Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Permanent installation of Unit 4 residual heat removal cooling system, residual heat removal cooling sea water system and emergency diesel generator cooling system Switching to the permanent cable for the electric motor of residual heat removal cooling se
[Submerged] Waste Treatment Building (Waste Treatment Building, locker room on 1st floor) ; Situation after the disaster(3/16) [pictured on March 16, 2011] Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about [Submerged] Waste Treatment Building (Waste Treatment Building, locker room on 1st floor) ; Situation after the disaster(3/16) [pictured on March 16, 2011]
[Submerged] Activated carbon gas hold-up system building (Ventilation and air-conditioning system of CCWS, Unit 3) ; Current situation [pictured on August 26, 2011] Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about [Submerged] Activated carbon gas hold-up system building (Ventilation and air-conditioning system of CCWS, Unit 3) ; Current situation [pictured on August 26, 2011]
[Submerged] Activated carbon gas hold-up system building (Ventilation and air-conditioning system of CCWS, Unit 3) ; Situation after the disaster [pictured on March 19, 2011] Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about [Submerged] Activated carbon gas hold-up system building (Ventilation and air-conditioning system of CCWS, Unit 3) ; Situation after the disaster [pictured on March 19, 2011]
[Submerged] Turbine Building (HSCR condensate water transfer pumpr on the second basement, Unit 3) ; Current situation(8/29) [pictured on August 29, 2011] Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about [Submerged] Turbine Building (HSCR condensate water transfer pumpr on the second basement, Unit 3) ; Current situation(8/29) [pictured on August 29, 2011]
[Submerged] Turbine Building (HSCR condensate water transfer pumpr on the second basement, Unit 3) ; Situation after the disaster(3/19) [pictured on March 19, 2011] Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about [Submerged] Turbine Building (HSCR condensate water transfer pumpr on the second basement, Unit 3) ; Situation after the disaster(3/19) [pictured on March 19, 2011]
[Submerged] Turbine Building (Condansate pump on the first basement, Unit 1) ; Current situation(8/26) [pictured on August 26, 2011] Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about [Submerged] Turbine Building (Condansate pump on the first basement, Unit 1) ; Current situation(8/26) [pictured on August 26, 2011]
[Submerged] Turbine Building (Condansate pump on the first basement, Unit 1) ; Situation after the disaster(3/20) [pictured on March 20, 2011] Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about [Submerged] Turbine Building (Condansate pump on the first basement, Unit 1) ; Situation after the disaster(3/20) [pictured on March 20, 2011]
[Submerged] Second basement of Reactor Building (Storm drain sump, Unit 1) ; Current situation(8/26) [pictured on August 26, 2011] Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about [Submerged] Second basement of Reactor Building (Storm drain sump, Unit 1) ; Current situation(8/26) [pictured on August 26, 2011]