Water injection by fire engine truck [pictured on March 16, 2011] Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Water injection by fire engine truck [pictured on March 16, 2011]
Unit 4 Spent Fuel Pool circulating cooling system oozing water from flexible hose Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Unit 4 Spent Fuel Pool circulating cooling system oozing water from flexible hose
Regarding the Submission of Operation Record and Other Related Documents Concerning Performance of the Isolation Condenser of Unit 1 at Tsuruga Power Station, Japan Atomic Power Co., Inc. (Request) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Regarding the Submission of Operation Record and Other Related Documents Concerning Performance of the Isolation Condenser of Unit 1 at Tsuruga Power Station, Japan Atomic Power Co., Inc. (Request)
Vol. 2; Effort for treating radioactive accumulated water No.4; Individual Tank Water Amounts and Water Storage Plan/Water treatment Facility to Bolster its Reliability Video on November 12, 2011 Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Vol. 2; Effort for treating radioactive accumulated water No.4; Individual Tank Water Amounts and Water Storage Plan/Water treatment Facility to Bolster its Reliability Video on November 12, 2011
Vol.2; Effort for treating radioactive accumulated water No.4; Individual Tank Water Amounts and Water Storage Plan/Water treatment Facility to Bolster its Reliability Sprinkling Water (2) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Vol.2; Effort for treating radioactive accumulated water No.4; Individual Tank Water Amounts and Water Storage Plan/Water treatment Facility to Bolster its Reliability Sprinkling Water (2)
After the support point was detached [photo taken on September 7, 2012] Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about After the support point was detached [photo taken on September 7, 2012]
After the reactor was opened [photo taken on September 22, 2012] Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about After the reactor was opened [photo taken on September 22, 2012]
The motor of the vacuum pump from which smoke came out Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about The motor of the vacuum pump from which smoke came out
Unit 3 of Fukushima Daiichi Nuclear Power Station swelling of water injection hose to reactor Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Unit 3 of Fukushima Daiichi Nuclear Power Station swelling of water injection hose to reactor
Fukushima Daiichi Nuclear Power Station; Unit 3 Measurement of Radiation Dose of Emergency Gas Treatment System and the Result of the Status of Valves Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Fukushima Daiichi Nuclear Power Station; Unit 3 Measurement of Radiation Dose of Emergency Gas Treatment System and the Result of the Status of Valves