Vol.2; Effort for treating radioactive accumulated water No.2; Water processing facility (removal of radioactivity) Cesium adsorption towers and media filter [pictured on August 2, 2011] Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Vol.2; Effort for treating radioactive accumulated water No.2; Water processing facility (removal of radioactivity) Cesium adsorption towers and media filter [pictured on August 2, 2011]
Vol.2; Effort for treating radioactive accumulated water No.2; Water processing facility (removal of radioactivity) Crane for vessel replacement [pictured on August 2, 2011] Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Vol.2; Effort for treating radioactive accumulated water No.2; Water processing facility (removal of radioactivity) Crane for vessel replacement [pictured on August 2, 2011]
The Repaired part for chemical leakage of water treatment system(coagulation settling facility) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about The Repaired part for chemical leakage of water treatment system(coagulation settling facility)
Water leakage (freshwater) from a hose of the water desalinations (reverse osmosis membrane system) near the concentrated water storage area at Fukushima Daiichi Nuclear Power Station Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Water leakage (freshwater) from a hose of the water desalinations (reverse osmosis membrane system) near the concentrated water storage area at Fukushima Daiichi Nuclear Power Station
Regarding responses to leakage of water containing radioactive material from Pipes Transferring concentrated water to concentrated water Tanks of Desalination Devices in Fukushima Daiichi Nuclear Power Station, Tokyo Electric Power co., Inc. (Direction) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Regarding responses to leakage of water containing radioactive material from Pipes Transferring concentrated water to concentrated water Tanks of Desalination Devices in Fukushima Daiichi Nuclear Power Station, Tokyo Electric Power co., Inc. (Direction)
Regarding the discharge of the waste water, of which the concentration of radioactive materials exceeds the concentration limit by the notification, to the sea Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Regarding the discharge of the waste water, of which the concentration of radioactive materials exceeds the concentration limit by the notification, to the sea
Water leakage from Transfer Line to Buffer Tank (47.8KB) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Water leakage from Transfer Line to Buffer Tank (47.8KB)
Water leakage from the Second Cesium Absorption Apparatus (SARRY) vent Line Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Water leakage from the Second Cesium Absorption Apparatus (SARRY) vent Line
Water leakage in Unit 3 Turbine Building at Fukushima Daiichi Nuclear Power Station Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Water leakage in Unit 3 Turbine Building at Fukushima Daiichi Nuclear Power Station
Water leakage in Unit 3 Turbine Building at Fukushima Daiichi Nuclear Power Station Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Water leakage in Unit 3 Turbine Building at Fukushima Daiichi Nuclear Power Station