Soil enhancement with sodium silicate Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Soil enhancement with sodium silicate
Removal of highly contaminated water in the trenches Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Removal of highly contaminated water in the trenches
Sea-side impermeable wall Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Sea-side impermeable wall
Frozen-soil impermeable walls Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Frozen-soil impermeable walls
Sub-drains and groundwater drains Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Sub-drains and groundwater drains
Groundwater bypass Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Groundwater bypass
Waterproof pavement Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Waterproof pavement
Multi-nuclide removal equipment, etc. Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Multi-nuclide removal equipment, etc.
Increase in the number of water storage tanks, etc. Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Increase in the number of water storage tanks, etc.
The Protection platform installation on Unit 4 spent fuel pool at Fukushima Daiichi Power Station Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about The Protection platform installation on Unit 4 spent fuel pool at Fukushima Daiichi Power Station