Results of investigation into building frames around Unit 1 reactor building equipment hatch at Fukushima Daiichi NPS Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Results of investigation into building frames around Unit 1 reactor building equipment hatch at Fukushima Daiichi NPS
Improved Robot for Investigation inside the Primary Containment Vessel (Scorpion Robot) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Improved Robot for Investigation inside the Primary Containment Vessel (Scorpion Robot)
Check of the leakage from the equipment hatch [pictured on April 26, 2011] Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Check of the leakage from the equipment hatch [pictured on April 26, 2011]
Check of the leakage from the electrical penetration [pictured on April 26, 2011] Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Check of the leakage from the electrical penetration [pictured on April 26, 2011]
Result of airborne radiation and Temperature of 1st to 5th floor in Reactor Building of Unit 2 at Fukushima Daiichi Nuclear Power Station surveyed by Robot Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Result of airborne radiation and Temperature of 1st to 5th floor in Reactor Building of Unit 2 at Fukushima Daiichi Nuclear Power Station surveyed by Robot
Results of soundness inspection of Unit 2 TIP guide pipe (4th day) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Results of soundness inspection of Unit 2 TIP guide pipe (4th day)
Results of soundness inspection of Unit 2 TIP guide pipe (3rd day) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Results of soundness inspection of Unit 2 TIP guide pipe (3rd day)
Results of soundness inspection of Unit 2 TIP guide pipe (2nd day) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Results of soundness inspection of Unit 2 TIP guide pipe (2nd day)
Results of soundness inspection of Unit 2 TIP guide pipe (1st day) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Results of soundness inspection of Unit 2 TIP guide pipe (1st day)
Airborne radiation dose measured by Robot at 1st floor of Reactor Buildings of Unit 3 at Fukushima Daiichi Nuclear Power Station Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Airborne radiation dose measured by Robot at 1st floor of Reactor Buildings of Unit 3 at Fukushima Daiichi Nuclear Power Station