Changes/Corrections made to the reports on our facility management plan for Unit 1-4 of Fukushima Daiichi Nuclear Power Station based on the "Policy on the Mid-term Security" (Version 2, Revision 2 and Version 3, Revision) Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about Changes/Corrections made to the reports on our facility management plan for Unit 1-4 of Fukushima Daiichi Nuclear Power Station based on the "Policy on the Mid-term Security" (Version 2, Revision 2 and Version 3, Revision)
Regarding Evaluation of the Report on Detection of Xe-135 from the Primary Containment Vessel of Unit 2 at Fukushima Daiichi Nuclear Power Station, Tokyo Electric Power Co., Inc. Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about Regarding Evaluation of the Report on Detection of Xe-135 from the Primary Containment Vessel of Unit 2 at Fukushima Daiichi Nuclear Power Station, Tokyo Electric Power Co., Inc.
Regarding the Seismic Safety Evaluation and Examination of Measures Such as Seismic Reinforcement Work on the Reactor Building of Unit 3 at Fukushima Daiichi Nuclear Power Station Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about Regarding the Seismic Safety Evaluation and Examination of Measures Such as Seismic Reinforcement Work on the Reactor Building of Unit 3 at Fukushima Daiichi Nuclear Power Station
Regarding Confirmation Results of Implementation status of Emergency Safety Measures Required for Maintaining Cold Shutdown Condition of Reactors and Reliability Assurance of External Power Supply in Light of the Accident at Fukushima Daiichi Nuclear Powe Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about Regarding Confirmation Results of Implementation status of Emergency Safety Measures Required for Maintaining Cold Shutdown Condition of Reactors and Reliability Assurance of External Power Supply in Light of the Accident at Fukushima Daiichi Nuclear Powe
Truck with nitrogen supply equipment [pictured on May 6, 2011] Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about Truck with nitrogen supply equipment [pictured on May 6, 2011]
Power networks (Attachment) Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about Power networks (Attachment)
The building which is storing (including accumulating) high level radioactive contaminated water, etc. (Attachment) Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about The building which is storing (including accumulating) high level radioactive contaminated water, etc. (Attachment)
Treatment system for high level radioactive contaminated water, Accumulate facilities(tank etc.) , Storage facilities for sludge, Storage facilities for used cesium adsorption vessel and concerned facilities (transport pipe, transport pump etc.) (Attachme Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about Treatment system for high level radioactive contaminated water, Accumulate facilities(tank etc.) , Storage facilities for sludge, Storage facilities for used cesium adsorption vessel and concerned facilities (transport pipe, transport pump etc.) (Attachme
Nitrogen gas injection system for Primary Containment Vessel (Attachment) Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about Nitrogen gas injection system for Primary Containment Vessel (Attachment)
Submission of Report on the Current Seismic Safety and Reinforcement of the Reactor Buildings at Fukushima Daiichi Nuclear Power Station to the Nuclear Regulation Authority (No.1) (Supplement) (Revision 2) to the Nuclear Regulation Authority Submitted by Fukushima Nucl… on Thu, 12/03/2020 - 10:17 Read more about Submission of Report on the Current Seismic Safety and Reinforcement of the Reactor Buildings at Fukushima Daiichi Nuclear Power Station to the Nuclear Regulation Authority (No.1) (Supplement) (Revision 2) to the Nuclear Regulation Authority