The result of the examination in the reactor building of Unit 2 Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about The result of the examination in the reactor building of Unit 2
Revision of frequency of sampling collection and measurement and nuclide analysis plan Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Revision of frequency of sampling collection and measurement and nuclide analysis plan
Results of Investigation on 5th Floor of the Reactor Building Unit 4 Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Results of Investigation on 5th Floor of the Reactor Building Unit 4
Survey status of Trenches etc. at Fukushima Daiichi Nuclear Power Station (Preliminary Report on February 13, 2012) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Survey status of Trenches etc. at Fukushima Daiichi Nuclear Power Station (Preliminary Report on February 13, 2012)
The Operation of Ventilation and Air-conditioning System at Reactor Building of Unit 5 and 6 at Fukushima Daiichi Nuclear Power Station Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about The Operation of Ventilation and Air-conditioning System at Reactor Building of Unit 5 and 6 at Fukushima Daiichi Nuclear Power Station
Unit 2 of Fukushima Daiichi Nuclear Power Station; The result of investigation of the inside the R/B (1st floor) and of radiation dose measurement. Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Unit 2 of Fukushima Daiichi Nuclear Power Station; The result of investigation of the inside the R/B (1st floor) and of radiation dose measurement.
Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake [Daily Report as of 6; 30 PM, February 23 2013] Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake [Daily Report as of 6; 30 PM, February 23 2013]
Total amount of radioactive materials in port (Appendix) Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Total amount of radioactive materials in port (Appendix)
The detection of radioactive materials in the water on the 1st basement of the Turbine Building at the site of Fukushima Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about The detection of radioactive materials in the water on the 1st basement of the Turbine Building at the site of Fukushima
Result of the second investigation inside of Primary Containment Vessels, Unit 2, Fukushima Daiichi Nuclear Power Plant Submitted by Fukushima Nucl… on Fri, 12/04/2020 - 10:12 Read more about Result of the second investigation inside of Primary Containment Vessels, Unit 2, Fukushima Daiichi Nuclear Power Plant